Béchar – Tindouf train: what to know about the new western line

Since 1 February 2026, Tindouf has been linked to the rest of the country by rail. The western mining line, about 950 km long between Béchar and the Gara Djebilet iron deposit, carries both ore and passengers. It is one of the largest railway projects in Algeria's history. Here is what to know, whether you plan to ride it or are simply following the project.
A line across the desert
The line leaves Béchar and runs south-west through Abadla, Hammaguir, Tabelbala, Hassi Khebi and Oum El Assel to Tindouf, then continues to the Gara Djebilet mine. Besides these main stations, some thirty passing stations let trains cross on the single track.
Work began in November 2023 for Anesrif, the public agency in charge of railway investment, by a group of Algerian companies (Cosider, ENGOA, Infrarail, SONAGC, Infrafer) and the Chinese CRCC. The first section, Béchar – Abadla, opened in April 2025; the whole line was finished at the end of 2025, ahead of the June 2026 deadline. The President of the Republic opened the line on Sunday 1 February 2026 in Béchar, welcoming the first passenger train from Tindouf.
Taking the Béchar – Tindouf train
- The train: 260-seat trainsets, in first and second class, with a restaurant car.
- The fare: 1,490 DA in first class and 1,175 DA in second class between Béchar and Tindouf, according to SNTF at the opening.
- The journey time: according to the SNTF timetable of November 2026, the night train links Béchar to Tindouf in a little over 11 hours; a shuttle also links Béchar to Abadla every day.
- The days: the train does not run every day in both directions. Check the departures on our Béchar – Gara Djebilet line page and the Tindouf station page (in French).
From Béchar, the Béchar – Oran line (in French) reaches the north-west of the country: for the first time, you can travel from Tindouf to the Mediterranean by train, changing at Béchar.
Practical tips: this is a night journey across the desert. Nights there are cool for much of the year: bring a jacket, water and something to eat, even with the restaurant car. Buy your ticket in advance during the holidays.
Why this line matters
Gara Djebilet, south-east of Tindouf, is one of the largest iron deposits in the world, left unexploited for lack of transport. The train is to carry the ore to Béchar and then north: about 500,000 tonnes are targeted in 2026 and one million tonnes in 2027, bound for Tindouf, Béchar and the port of Bethioua, near Oran.
For the people of Tindouf and the oases along the way, the line above all changes daily life: a trip to Béchar or Oran no longer depends only on the road or the plane. A second phase, planned for 2028, is to add new locomotives and passenger coaches, and Abadla is to become the junction of a future line to Adrar.
In figures
| Length | about 950 km |
| Passenger stations | Béchar, Abadla, Hammaguir, Tabelbala, Hassi Khebi, Oum El Assel, Tindouf |
| Construction | about two years (November 2023 – December 2025) |
| Opening | 1 February 2026 |
| Béchar – Tindouf ticket | 1,490 DA (1st) · 1,175 DA (2nd) |
| Ore target | 0.5 Mt in 2026, 1 Mt in 2027 |
This line's timetable, like the rest of the SNTF network, is also in the free Rekba app, if you would rather have it at hand.
Sources
- APS — Le président de la République annonce officiellement le lancement de l'exploitation de la ligne Gara Djebilet – Tindouf – Béchar (1er février 2026)
- Radio Algérie — Sofiane Aibèche : la SNTF a mis le dispositif nécessaire pour réussir la ligne Tindouf – Béchar
- Radio Algérie — Ligne minière ferroviaire Ouest : une infrastructure sans précédent
- Radio Algérie — La SNTF prévoit deux dessertes quotidiennes de voyageurs Béchar – Tindouf
- TSA — Tebboune inaugure la ligne ferroviaire Béchar – Gara Djebilet sur 950 km
- TSA — L'Algérie relie Tindouf à la Méditerranée par train